top of page
Search

What Happens After You Buy Land in Portugal?

  • Writer: Natasha Santric
    Natasha Santric
  • 3 days ago
  • 3 min read

Buying land in Portugal is an exciting step, but it’s only the beginning of the journey. What happens next can have a major impact on your budget, timelines, and overall experience. Understanding the process from the start helps avoid costly redesigns, delays, and unnecessary stress.

This guide walks through the key steps after purchasing land, assuming the land is urban and buildable. Other land classifications may require additional planning steps before a project can begin.


1. Clarify How You Want to Build

Before contacting an architect, it’s important to have a general idea of how you want the house to be built, not just how it should look.

Common construction systems in Portugal include:

  • Concrete (traditional masonry)

  • Wood-frame construction

  • Steel-frame construction

  • Hybrid systems combining multiple methods

Each system affects wall thickness, insulation, structure, spans, energy performance, and cost. These factors directly influence the design. If the construction method isn’t considered from the start, the project may need to be redesigned later, which often leads to wasted time and higher fees.


2. Choose the Right Architect

Many buyers focus on aesthetics when choosing an architect, but technical compatibility matters just as much.

When comparing architects, consider:

  • Experience with your chosen construction system

  • Familiarity with local municipal rules

  • Ability to design within your realistic budget

  • Willingness to collaborate with builders and engineers

An architect who understands how the house will be built can design more efficiently and avoid unnecessary complications later in the process.



3. Concept Design and Floor Plans

The concept phase typically includes:

  • Floor plans

  • Site integration and orientation

  • Room sizing and circulation

  • Basic massing and volumes

This is the most important stage for decision-making. Changes are still relatively easy and inexpensive here compared to later phases. Getting the layout right early saves significant time and cost further down the line.


4. 3D Renderings (Optional but Helpful)

While not required for approval, 3D renderings are often useful to:

  • Visualize volumes and proportions

  • Understand roof shapes and elevations

  • Align expectations before pricing

They can also help builders better understand the project when preparing estimates.


5. Builder Pricing and Feasibility Checks

Once the design is sufficiently developed, plans are sent to one or more builders to:

  • Validate construction feasibility

  • Refine materials and technical details

  • Produce realistic cost estimates

This stage often leads to small design adjustments to bring the project in line with budget expectations. Making these changes before submission is far easier than during construction.


6. Engineering Plans

After the design and budget are aligned, engineering studies are prepared. These typically include:

  • Structural engineering

  • Thermal and acoustic calculations

  • Water, sewage, and electrical systems

This phase usually takes around three to five weeks, depending on the complexity of the project.


7. Submission to the Câmara (Municipality)

The complete project is then submitted to the local municipality for approval.

While the legal target response time is around 30 business days, actual timelines vary by municipality. Requests for clarifications or adjustments are common and part of the normal process.



8. Mortgage Applications and Financing

Once the project is submitted, this is often a good moment to begin mortgage applications.

For foreign buyers:

  • Initial bank feedback often takes one to two weeks

  • Final conditions may depend on project approval and builder contracts

Starting financing discussions at this stage helps align timelines without committing too early.


9. Project Approval and Construction

Once approval is granted:

  • Final permits are issued

  • Contracts are finalized

  • Construction can begin

From this point onward, the focus shifts from planning to project management and execution.


Final Thoughts

Building a home in Portugal is not just about design, it’s about making the right decisions early. Understanding how construction systems, architects, builders, approvals, and financing fit together can save significant time, money, and frustration.

Good projects start long before construction begins.

If you’re considering buying land or starting a project in Portugal and want guidance through the process, having the right advice from the beginning makes all the difference.


 
 
 

Comments


bottom of page